ARBI
Documents / docs/project/design-status.md

Design status

Meaning of this page

This is a current evidence inventory, not a purchasing list and not a certification statement. “Baseline” means selected in the current committed design. “Unverified” means no repository evidence currently demonstrates the claim.

Status summary

Area Current baseline Evidence status
Site 25 current beds, 30-bed capacity, approximately 29.2 × 6.6 m anchor rectangle Geometry recorded; actual site survey unverified
Corner stations Four treated timber posts with outward guys and approximately 3 m pulley height Printed-head design proposal adds winch-aligned carrier halves, integrated post adapters, rear pads, covers and ordinary bought fasteners. Concealed cover proposal #232 revises carriers to r1.2.0 and pads/covers to r0.3.0 with continuous internal T-slide guides and positive underside-releasable printed latches. The smooth shells use no cover screws, nuts or ties; physical fit, release force, latch fatigue and retention remain pending. Print process, load/creep/weather qualification, received pin/keeper/guy fit and site/structural acceptance remain unverified. Historical metal and split-clamp alternatives are archived outside current BOM quantities and fabrication downloads
Winches Direct-drive 3 Nm closed-loop steppers, external shaft bearings, single-layer printed drums Selected concept; 23HS40 supplier drawing and nominal motor mesh checks define the purchased motor reference; full-cover nominal CAD/service checks added; physical fit, force, heat, weather and guarding unverified
Winch-owned positioning lines Three normal Dyneema lines plus one 48 V powered hybrid line Novel powered-line construction; fatigue, insulation, and cycle life unverified
Camera pod Pi 3A+, Camera Module 3, two micro servos, 100–120 g target, 170 g ceiling Tie-free retention r0.5.0 adds six removable prints to revised deck/carrier r0.3.0; actual can/cable/liner fit, grip, fatigue and strength remain unverified. Stock fastener proposal #225 uses M3 × 12/25 and M2 × 8 without changing PCB holes; new captive posts and smaller frame screws require fresh nominal and physical acceptance. dry bench record, earlier record, selected compact gimbal inside a one-piece moving head, and current reinforced-cradle CAD record; compact-gimbal nominal CAD checks, including the continuous underside seam, pass; the servo measurement/opening-fit report corrects the end-hole pitch to 25 mm and records a 31.8 × 9 × 24.5 mm envelope, with revised fit accepted by the owner; the received converter replaces the assumed envelope with 50 × 30 × 17 mm and four Ø3 mm holes at 45 × 24 mm pitch; the repeat camera-cover fit failure and hood r0.1.3 correction add nominal handling clearance with physical reprint acceptance pending; the prior r0.1.2 configuration had a 251.734 g solid-volume PETG estimate for 16 installed prints (not sliced or measured mass); moving-head torque/settling, complete flying mass, fit, rain, thermal, electrical and imaging acceptance remain unverified
Dock High dock on a non-powered corner, sharing the corner-set post configuration; passive capture remains the intended operating behavior DOCK-IF-01 supported-dummy bench kit has 13 fabrication models, 28 installed prints, a manual fork, spider bridge, split arm and reproducible PDF/STL pack. The selected rounded shelter now adds a removable charcoal underside; roof/reference are 0.3.0, lower panels 0.1.0, guide 0.2.0 and flat-shoulder stud 0.1.1. Eight dedicated M3 bolts retain the black panels without disturbing structural M4 joints. Nominal geometry evidence remains separate from print, service, strength and weather acceptance; added shelter dead load/wind reactions require LC-05 review. The pod attachment adds about 119 g of solid-volume PETG before hardware; complete mass, clamp retention, automatic capture, actuator/sensors and all-line power-loss restraint remain unverified. The acceptance record is blank
Control cabinet Protected 230 V entry, two 48 V/350 W supplies, Pico 2 W control, fused branches Logical baseline and proposed cabinet layout with assembled/exploded CAD recorded; enclosure selection, protection coordination, earthing, thermal, and field wiring unverified
Motion software Local synchronized STEP/DIR control, Euclidean cable targets, positive tension Pico C11 diagnostic foundation cross-build and host checks recorded; target remains unconfigured/unenrolled/inhibited; revision-bound geometry supplies commanded/estimated source checks; no isolated-board/real-system validation
Imaging software Move, stop, gimbal, settle, autofocus, capture, rectify, upload Desired workflow; settling time and repeatability unverified
Safety Local safety authority and instrumentation requirements, independent limits/stopping, docking and restraint Interface owners and evidence gates recorded; circuits, measurements, power-loss restraint and qualified physical review remain unverified; safety case incomplete
Simulation Scenario 1.0 and bounded plant/module references; future digital twin and controller-tuning environment Deterministic TypeScript/Python host evidence recorded; physical model fidelity, runtime integration and field behavior unverified
Online software and deployment ADR-0005: Vercel dashboard/API, Ably notifications, external Postgres/private objects, independent local runtimes and releases Capability review and local recovery experiment, site authorization, simulation-only enrollment/transactional inventory and image metadata/private Blob SDK boundary with isolated HTTP/PostgreSQL evidence recorded; durable cloud jobs/exclusive leases with isolated PostgreSQL evidence recorded; authenticated dashboard shell and explicit bounded-plant test provider recorded with separate source/hosted evidence; bounded current telemetry/event history and configured assembly inventory recorded with isolated database/HTTP evidence; usage/policy and bounded correlated audit screens recorded with native/browser evidence; cloud operations and isolated restore quarantine recorded with native evidence; bounded simulated controls recorded with independent edge/browser evidence; actual web–cloud–edge protocol integration recorded with signed telemetry and protocol fault evidence; bounded live-session authority recorded with native isolated-signaling evidence; owned media grants and delivery references recorded with software/native audit evidence; live provider integration, broker routing, live media, OTA recovery and physical operation unverified

Baseline choices that must remain traceable

The durable local job slice adds SQLite job/audit-intent transactions, current local policy and an optional bounded simulator consumer. Process-crash and policy host evidence remains separate from selected-host storage/power loss, real Pico/pod instrumentation, independent stopping, bench/HIL and installed qualification. Physical actuation remains inhibited.

The device metering slice implements bounded durable application attempts, Linux interface snapshots and an optional router report seam. Host evidence covers precise counters, interruption/retry and crash/capacity handling; native Linux CI, actual SIM/router/provider coverage, storage power loss and installed operation remain separate evidence. No counter enables recording or changes local safety authority.

The realtime recovery slice adds exact scoped Ably SDK subscription tokens, persisted routing/presence/outbox and commit-safe PostgreSQL replay, plus an opt-in bounded browser subscription/recovery client. Host evidence covers independent cloud/consumer processes and real SDK transport fixtures; the browser checks cover Chromium against authenticated HTTP/native PostgreSQL and a synthetic broker transport. Isolated live Ably/Neon/Vercel provisioning, measured mobile reconnect/revocation/quotas and physical acceptance remain open under #29. Neither recovery client can dispatch actuators or acknowledge job execution.

The ADR-0008 edge prototype adds executable diagnostic health/readiness, bounded mutually authenticated simulated local adapters and a Linux service definition. Development-host tests establish source and portable supervision behavior only; exact cabinet host, real transports, Linux confinement, power-loss durability and physical activation remain unverified.

  • Four-cable architecture and local ownership of motion and safety.
  • No battery or propulsion on the pod.
  • High dock as the normal automatic parking location.
  • Direct-drive winches without belt, gearbox, or reduction pulley.
  • Single-layer drum to keep effective radius predictable.
  • Pico 2 W and CL57Y-V20 STEP/DIR interface rather than RS485/Modbus.
  • Camera Module 3 Wide (120° diagonal) with two-axis gimbal; owner-confirmed selection and hood fit revision.
  • 48 V distribution and pod power conversion close to the pod load.
  • OpenSCAD as the canonical source for custom models.
  • Assembly-owned documentation and normalized BOM data.

Changing one of these choices should reference an ADR or a GitHub issue that records the reason, evidence, and compatibility impact.

Known contradictions resolved by documentation policy

The committed requirements specify a permanent high dock and also ask for servicing without a ladder. The V1 interpretation is:

  • automatic HOME and parking remain at the high dock, with the bottom of the parked pod targeted around 2.4–2.5 m;
  • service access is provided only through a manually initiated, controlled MAINTENANCE procedure after the work area has been cleared;
  • the controller must never enter below-head-height maintenance positioning automatically.

This interpretation still needs a validated recovery and maintenance procedure. See weather, parking, and maintenance.

Evidence still required before public operation

The authorized commissioning consumer implements test-realm enrollment, versioned multi-device staging/activation and deliberate restart recovery, with host evidence. Its configuration readiness and analytical framing fixtures clear no physical commissioning gate.

Loaded/installed operational actuation and motion-controller updates remain disabled until the stage-specific local safety gates pass. Explicitly authorized secured isolated bench/HIL testing and flashing under a reviewed procedure may generate evidence; source checks and simulation cannot clear physical gates. Current driver-local encoders provide no measured position or tension to the Pico, and Parked alone is not update-safe.

  • actual site survey and geotechnical/anchor assessment;
  • maximum configured line tension and structural calculations;
  • proof-load procedure and acceptance limits;
  • line fatigue, electrical insulation, voltage-drop, and slip-ring tests;
  • motor and driver thermal/fault characterization;
  • signal-integrity testing for long outdoor STEP/DIR wiring;
  • dock retention and total-power-loss behavior;
  • safe stopping, emergency isolation, and recovery validation;
  • mains design, earthing, protection, enclosure, and installation review;
  • image repeatability, calibration, privacy, and data-retention controls;
  • inspection intervals and replacement criteria.

Command lifecycle software includes bounded denied-attempt aggregation, current audit-authorized trace views and original lease/software/configuration attribution. Calibration commits and simulated update terminal conversion retain explicit recovery policy; see lifecycle evidence. Physical home and installation outcomes remain separate gates.

Portable incident replay and explicit model comparison are available as isolated software tools with scoped read/export boundaries. Original clocks, gaps, unavailable channels and data/model revisions are preserved; incident evidence retains the missing physical bench-data gate. Replay has no actuator route.

Audit-completeness software coverage inventories all 17 HTTP routes and internal commissioning/update/disabled-recording hooks. Native source scenarios establish acknowledged admission, direct API denial/failure behavior, concurrent-source continuity and replay; provider lifecycle and physical outcomes remain explicitly unobserved. Cloud job/live/realtime audit sequences no longer consume protocol command numbers or another service epoch. Historical gaps are preserved.

Isolated signing trust and migration recovery adds root-signed public-key rotation/revocation, persisted clock/security floors, compatible replacement planning and actual SQLite prior-data recovery. The adapter is test-realm only and grants no motion/installation authority; production key custody, physical provisioning, installed boot recovery and live commissioning migration remain unverified.

Isolated update orchestration adds role-checked durable per-target operations, real bounded HTTP Range accounting, resumable cache verification, local refusal and persistent synthetic boot recovery. The fixture updates its edge coordinator last and cannot flash, reboot or actuate physical hardware. Browser flow, installed job/update locks, cellular/provider acceptance and qualified mechanical/power recovery remain separately gated.

Update dashboard software now separates web build identity, signed availability and observed target health, with explicit selection, allowance/override, durable reconnect and local refusal. Its actual isolated browser/BFF/SDK/Range/SQLite evidence remains separate from live publisher, installed recovery and physical acceptance.

Seeded service fault workflows exercise actual durable control/update/transfer and cloud viewing/media services with reproducible semantic traces. Alarm, restart, deadline, canary, budget, disabled recording and upload retry remain source/native/synthetic evidence; physical timing, camera/radio and installed recovery gates remain unverified.

The pod runtime foundation adds authenticated bounded loopback diagnostics, health provenance and native process/SQLite checks. It has no physical camera/gimbal adapter; named Pi 3A+ startup, resource, electrical and imaging evidence remain unverified.