Documents / docs/assemblies/dock/acceptance-record.md

Dock interface acceptance record

Blank configuration and evidence record for proposed interface study DOCK-IF-01. All physical results remain pending.

Blank record for proposed DOCK-IF-01, documentation revision 0.1.0. No physical result is recorded. All fields are pending. Complete one dated record per exact configuration and test stage; link the design package and bench plan.

Configuration and reviewed limits

Required record Value / evidence / reviewer
Record ID/date, authorized stage/rig and responsible operator/reviewer Pending
Source commit, CAD model IDs/revisions/parameters, mesh identities Pending
Pod/stud/structural attachment, measured mass/CG, gimbal/harness/line configuration Pending
Locator, fork/pawl, positive stops, retained overlap and wear limits Pending
Material/lot, printer/nozzle, orientation, conditioning and full slicer/process record Pending
Actual critical dimensions, tolerances, fasteners, locking and tool/service access Pending
Station/post/site or synthetic rig geometry, transforms and survey uncertainty Pending
Arm, station attachment, roof/lower enclosure with dedicated captive fasteners and full LC-01–LC-06 analysis Pending
Declared capture offsets/angles/swing/speeds, trial matrix and repeat counts Pending
Proof/dwell/cycle directions, forces/moments/durations and accepted deflection/residual set Pending
Actuator/linkage, supply/protection/isolation, travel/force/time and reset/power-off states Pending
Actual seating/engagement/release/clear observations, diagnostics and circuit revision Pending
Debounce/freshness/response deadlines and blocked/fault/recovery rules Pending
Independent fixture restraint/catch, exclusion, isolation and test stop conditions Pending
Instrument calibration, uncertainty, sampling and public-safe setup references Pending
Environmental envelope, inspection/replacement intervals and life rationale Pending

Results and authority

Test or evidence Result / raw record / reviewer
DT-01 Nominal geometry, retained contacts and approach/release clearance Pending
DT-02 Unloaded received/printed fit and service Pending
DT-03 Declared capture-envelope matrix, all successes and failures Pending
DT-04 Directional retention, slip, deflection and damage Pending
DT-05 Loaded/obstructed release and bounded output Pending
DT-06 False-state prevention and electrical/input faults; LS-16 Pending
DT-07 Interrupted power/link/reset and recovery; LS-16/17 Pending
DT-08 Cycling/dwell, contamination/temperature and post-test inspection Pending
DT-09 Shelter/panel retention and service, drainage, rain/condensation and heat Pending
DT-10 Maintenance, failed-capture/release and no-power recovery Pending
DT-11 Secured four-line forces/clearance and fault behavior Pending
DT-12 As-built installed clearance through disable/partial/total power loss; LS-18 Pending
Qualified structural/electrical/physical review and residual-risk acceptance Pending
Anomalies, failed trials, damaged/discarded parts and unresolved follow-ups Pending
Approved configuration, operating limits, scope, reviewer/date and next-stage restrictions Pending
Change/requalification policy and return-to-service procedure Pending

State blocked, failed or not tested when applicable; do not convert a missing value into a pass. A bench result cannot fill installed or qualified rows. A sensor state cannot fill structural-retention evidence, and pod retention cannot fill all-line-clearance evidence. Controller reset/update permission remains unavailable until the applicable LS-18 and other stage prerequisites are accepted. No acceptance is implied by a CAD export, simulation, CI result, merged document or completed issue.