Safety case

Current status

ARBI is an unvalidated engineering concept for an outdoor, overhead moving-line system near people, plants, weather, and mains-powered fixed equipment. This page is a safety-case scaffold. It is not a certification, declaration of conformity, or authorization for public operation.

ADR-0006 and the local safety interface matrix assign required inputs/outputs, local authority, independent stopping/restraint and evidence owners. Their acceptance records requirements, not completed circuits or physical safety evidence. Loaded/installed operational actuation and motion-controller updates remain disabled pending the stage-specific commissioning gates; explicitly authorized secured isolated bench/HIL work may produce that evidence under reviewed procedures.

Top-level safety claim

The intended top-level claim is:

The released ARBI configuration can perform approved imaging and parking operations within its documented environment without exposing people, property, or the system to unacceptable risk.

That claim is currently not demonstrated.

Minimum V1 safety requirements

  • independent hard travel limits and a safe software workspace;
  • motor-fault handling;
  • evidenced line slack/overload detection and accepted tension/clearance behavior, with sensing or an explicitly reviewed alternative;
  • HOME docking and a secure inactive state;
  • low-voltage operation on overhead and moving equipment;
  • strain relief on the powered line;
  • secondary retention for heavier mounted hardware;
  • correctly rated mains protection and earthing in the cabinet;
  • structural review of posts, guys, and anchors for actual site conditions;
  • an extremely light pod to reduce stored energy relative to industrial cable-camera systems.

These topics are necessary but not sufficient.

Hazard inventory

Hazard Example causes Required controls and evidence
Falling or swinging pod/hardware Line, termination, bracket, latch, or retention failure Mass limit; rated interfaces; secondary retention where appropriate; proof/load/fatigue evidence; exclusion zones; inspections
Low or slack line in accessible space Power loss, control fault, line break, parking error Clearance measurement; safe parking strategy; fault behavior; possible fail-safe brake; area control
Excess line force or structural collapse Bad trajectory, anchor error, wind, jam, calibration error Force/tension limits; workspace constraints; structural calculations; anchor tests; independent stop path
Pinch, crush, or entanglement Winch/drum/coupling, docking latch, moving line Guards; lockout; service controls; clearances; warning and training
Electric shock or fire Mains fault, moisture, earthing failure, damaged hybrid line, wrong protection Qualified design/install; isolation; protection coordination; IP/condensation strategy; fusing; inspection and electrical tests
Unexpected motion Software defect, stale command, reset, network issue, sensor fault Local state machine; watchdogs; command authentication/expiry; hard limits; deterministic reset and recovery
Weather damage or loss of control Wind, rain, lightning, UV, temperature, condensation Operating envelope; external weather policy or sensing; shelter; surge/lightning review; materials and inspections
Privacy or data exposure Images include people or private areas; public telemetry leaks location Capture zones; masking; access control; retention policy; secret and location scrub
Unsafe maintenance Automatic lowering, stored energy, remote start, ladder access Manual maintenance mode; area-cleared interlock/procedure; isolation; lockout; no unattended low positioning

Safety implementation and evidence still required

The matrix assigns functional responsibility. Assembly design and validation must still establish:

  • a readily accessible means of emergency isolation and a safe-stop strategy;
  • which limits are independent of cloud, edge application, and normal motion planning;
  • start-up, reset, watchdog, brownout, and partial-power behavior;
  • how each driver alarm, encoder error, sensor disagreement, and communication loss is detected;
  • the permissible response when docking is unavailable;
  • line-clearance behavior after total power loss;
  • guards and lockout for winch service;
  • environmental limits and who or what determines that operation is allowed;
  • inspection intervals and discard criteria for lines, terminations, printed parts, timber, fasteners, slip ring, and electrical insulation.

Structural evidence

The repository baseline proposes proof-loading the completed top bracket to at least the maximum configured line tension, preferably twice that value, and inspecting for permanent bending, timber crushing, bolt movement, or line contact. Before using this as an acceptance test, define:

  • maximum configured tension and all relevant load directions;
  • calibrated load application and measurement;
  • test fixture, exclusion zone, duration, and sequence;
  • quantitative movement/deformation limits;
  • post-test inspection and retorque criteria;
  • relationship between proof load, design factors, material variability, fatigue, soil, guy, and anchor calculations.

Proof loading does not make an otherwise unanalyzed structure safe.

Electrical evidence

The cabinet and field installation require qualified review for applicable Croatian and EU requirements. Evidence should cover protection, isolation, earthing/bonding, conductor sizing, voltage drop, fault current, segregation, enclosure and ingress, condensation, temperature, surge/lightning exposure, labeling, lockout, and test results. Never infer compliance from a parts list.

Operating stop conditions

Testing or operation stops when any of the following occurs unless an approved test procedure explicitly controls it:

  • a person enters the active exclusion zone;
  • a guard, retention, latch, enclosure, strain relief, or protective device is missing or bypassed;
  • line damage, low clearance, abnormal noise, unexpected motion, overheating, moisture ingress, electrical odor, or insulation damage is observed;
  • configuration, calibration, or assembly revision is unknown;
  • a required sensor, driver, controller, or local communication channel is unhealthy;
  • weather is outside the approved envelope or cannot be determined;
  • a recovery step would require improvisation near stored mechanical or electrical energy.

Evidence progression

  1. Analysis and review establish requirements and predicted limits.
  2. Bench tests characterize parts and isolated assemblies.
  3. A small frame validates integrated behavior in a controlled exclusion zone.
  4. Full-site commissioning validates the as-built configuration under restricted access.
  5. Qualified review accepts residual risk, limits, inspections, and operating procedures.
  6. Public operation begins only after all required evidence is linked to the released revision.

Simulator results may guide tests and expose defects, but never replace structural, electrical, environmental, or human-safety evidence.

Open safety questions

  • Is a normally engaged brake required before V1 public operation despite being deferred in the current baseline?
  • What maximum line tension, speed, acceleration, and kinetic energy are acceptable?
  • How are slack, line failure, and abnormal tension detected?
  • What wind, rain, lightning, and temperature limits apply, and how are they determined locally?
  • Which safeguards are independent enough to survive the same failure as normal control?
  • Which target-specific restraint and recovery procedure preserves every line's clearance through controller update/reset, driver disable and complete or partial power loss? Parked and the pod latch alone do not establish it.