Parts / guy-ground-anchoractive
Approximate · needs rework — guy-ground-anchor-r0.1.0.stl
component · off-the-shelf
Guy ground anchor
4 each required in the current BOM build.
BOM, procurement and usage detailsCritical · 1
- Approximate geometry · needs rework (guy-ground-anchor): Shape is not yet fully defined. Confirm the selected item against supplier drawings or measurements, then rework this model before using it for fit, clearance or fabrication. Resolve dimensions and interfaces before dependent assembly design.
Warning · 2
- Model status is concept-unvalidated; physical acceptance still needs committed evidence.
- njuskalo-guy-ground-anchor: Qualification is baseline-selected; the recorded selection is not engineering approval.
Issues · 6
- njuskalo-guy-ground-anchor: A quoted price cannot be extended without package data.
- njuskalo-guy-ground-anchor: Availability is unknown.
- njuskalo-guy-ground-anchor: Package size/MOQ is unknown.
- njuskalo-guy-ground-anchor: Price and availability observation date is unknown; quote capture time is not verification time.
- njuskalo-hr: Shipping is unknown; null is not treated as free.
- njuskalo-hr: Shipping observation date is unknown; quote capture time is not verification time.
Critical · Approximate · needs rework
Catalog 800 mm starting anchor length with assumed Ø12 mm shaft, eye and helical plate.
Shape is not yet fully defined. Confirm the selected item against supplier drawings or measurements, then rework this model before using it for fit, clearance or fabrication.
Resolve dimensions and interfaces before dependent assembly design.
Illustrative model only. This is not a manufacturing source or evidence of engineering approval.
- Model
- guy-ground-anchor
- Role
- Illustrative visualization
- Status
- Concept · unvalidated
- Revision
- 0.1.0
- Document
- Geometry and assumptions
CAD release
Requirements
- Approx. 800 mm or stronger ground anchor; actual capacity must be verified by pull test in site soil.
Prototype guy-anchor example from recorded baseline. Must be validated by pull test in actual site soil before relying on it.