ARBI
03 · Dock / dock-roof-spacerRev 0.1.0
Fig. — dock-roof-spacer-r0.1.0.stl

dock‑roof‑spacer

4×
installed

DOCK-IF-01 bench candidate: roof spacer. No load or fit qualification.

Warning · 2
  • Fabrication status is concept-unvalidated; fit, materials and physical acceptance still need committed evidence.
  • in-house-fabrication-dock-weather-hood: Qualification is baseline-selected; the recorded selection is not engineering approval.
Issues · 4
  • dock-weather-hood: Print material cost is estimated from solid CAD volume; supports, waste, shipping, tax adjustment, energy, machine time and labour are unresolved.
  • in-house-fabrication-dock-weather-hood: Price and availability observation date is unknown; quote capture time is not verification time.
  • in-house-fabrication-dock-weather-hood: Price is unknown.
  • in-house-fabrication-hr: Shipping observation date is unknown; quote capture time is not verification time.
StatusConcept · unvalidated
Rolefabrication
Revision0.1.0
Outputdock-roof-spacer-r0.1.0.stl
BOM itemDock weather roof / hood
Sourcehardware/assemblies/dock/dock-roof-spacer.scad
Documentdock/README.md

CAD release · SHA-256 56f44fed9a3cb1d9…

CAD figure
← Back to Dock exploded view