dock‑pod‑bridge

1×
installed

DOCK-IF-01 bench candidate: pod bridge. No load or fit qualification.

Warning · 2
  • Fabrication status is concept-unvalidated; fit, materials and physical acceptance still need committed evidence.
  • in-house-fabrication-dock-latch-hardware: Qualification is baseline-selected; the recorded selection is not engineering approval.
Issues · 4
  • dock-latch-hardware: Print material cost is estimated from solid CAD volume; supports, waste, shipping, tax adjustment, energy, machine time and labour are unresolved.
  • in-house-fabrication-dock-latch-hardware: Price and availability observation date is unknown; quote capture time is not verification time.
  • in-house-fabrication-dock-latch-hardware: Price is unknown.
  • in-house-fabrication-hr: Shipping observation date is unknown; quote capture time is not verification time.
StatusConcept · unvalidated
Rolefabrication
Revision0.1.0
Outputdock-pod-bridge-r0.1.0.stl
BOM itemDOCK-IF-01 fork, structural pod bridge and stud print set
Sourcehardware/assemblies/dock/dock-pod-bridge.scad
Documentdock/README.md

CAD release · SHA-256 4e76c789fec77bc6…