DOCK-IF-01 guide quadrant with edge-open line passage; 275 mm mouth / 60 mm throat. No load or installed routing qualification.

Warning · 2
  • Fabrication status is concept-unvalidated; fit, materials and physical acceptance still need committed evidence.
  • in-house-fabrication-dock-capture-set: Qualification is baseline-selected; the recorded selection is not engineering approval.
Issues · 4
  • dock-funnel: Print material cost is estimated from solid CAD volume; supports, waste, shipping, tax adjustment, energy, machine time and labour are unresolved.
  • in-house-fabrication-dock-capture-set: Price and availability observation date is unknown; quote capture time is not verification time.
  • in-house-fabrication-dock-capture-set: Price is unknown.
  • in-house-fabrication-hr: Shipping observation date is unknown; quote capture time is not verification time.
StatusConcept · unvalidated
Rolefabrication
Revision0.2.0
Outputdock-guide-quarter-r0.2.0.stl
BOM itemHigh-dock alignment funnel
Sourcehardware/assemblies/dock/dock-guide-quarter.scad
Documentdock/README.md

CAD release · SHA-256 c271dc964de21ce3…