ARBI
Parts / dock-funnelactive
Fig. — dock-guide-quarter-r0.2.0.stl
component · fabricated · printed

High-dock alignment funnel

1 each required in the current BOM build.

BOM, procurement and usage details
Warning · 2
  • Fabrication status is concept-unvalidated; fit, materials and physical acceptance still need committed evidence.
  • in-house-fabrication-dock-capture-set: Qualification is baseline-selected; the recorded selection is not engineering approval.
Issues · 4
  • dock-funnel: Print material cost is estimated from solid CAD volume; supports, waste, shipping, tax adjustment, energy, machine time and labour are unresolved.
  • in-house-fabrication-dock-capture-set: Price and availability observation date is unknown; quote capture time is not verification time.
  • in-house-fabrication-dock-capture-set: Price is unknown.
  • in-house-fabrication-hr: Shipping observation date is unknown; quote capture time is not verification time.
Model
dock-guide-quarter
Role
fabrication
Status
Concept · unvalidated
Revision
0.2.0
Document
Geometry and assumptions

CAD release

Requirements

DOCK-IF-01 bench-development kit, not accepted for suspended installation. Bought hardware is counted separately.