Interface policy

Every interface must name its endpoints, owner, revision, normal range, startup state, failure detection, isolation method, and acceptance test. Connector color alone is not an interface definition.

ADR-0006 and the local safety interface matrix assign motion/stop authority, required observations and stage-specific evidence. They do not allocate additional GPIOs or validate circuits. Independent safeguards must survive normal-control failure; driver disable/power removal requires a reviewed restraint response, and Parked cannot authorize updates by itself.

Physical interfaces

Interface Endpoint A Endpoint B Owner
Structural ground reaction Soil / anchor Corner post and outward guy Site installation and corner station
Line routing Corner pulley tangent Winch drum tangent Corner station and winch
Positioning load Four line terminations Camera-pod spider Positioning lines and camera pod
Dock capture Pod docking stud Funnel, locating socket, and latch Dock
Dock support Dock arm Docked corner station Dock and corner station
Service mount Winch frame Corner-station pole face Winch

Exact interface drawings, tolerances, fasteners, and inspection points belong in the owning assembly revisions.

Electrical and signal interfaces

  • Fixed mains enters only the control cabinet through rated isolation and protection.
  • Two baseline 48 V/350 W supplies feed fused low-voltage branches.
  • Each pole receives a separately protected 48 V and return branch for its CL57Y-V20 driver.
  • Each pole receives one outdoor control cable for STEP/DIR and returns, plus local home/reference wiring as designed.
  • The powered winch passes 48 V through a rated slip ring and two conductors in the hybrid line.
  • The pod converts 48 V to 5 V near the load and buffers short transients with approximately 1000 µF as a starting value.
  • The edge service communicates locally with the Pico and pod; protocol, authentication, timeout, replay, and compatibility rules remain to be specified.

The repository's V1 Pico assignment is:

Axis STEP DIR
A GP2 GP3
B GP4 GP5
C GP6 GP7
D GP8 GP9

The V1 wiring baseline routes STEP/ground on the orange pair and DIR/ground on the green pair of each outdoor Cat5e cable, with blue reserved for enable/alarm and brown spare. This is a baseline wiring concept, not long-run signal-integrity evidence.

Proposed operating states

The current repository baseline describes sequences but not a complete formal state model. The following state names are proposed for implementation and simulation:

stateDiagram-v2
    [*] --> Boot
    Boot --> Homing
    Homing --> Ready
    Ready --> Moving: accepted job
    Moving --> Settling
    Settling --> Capturing
    Capturing --> Ready: more captures
    Capturing --> Returning: job complete
    Ready --> Returning: idle policy
    Returning --> Docking
    Docking --> Parked: latch and dock confirmation
    Parked --> Ready: release and clear dock
    Parked --> Maintenance: manual authorization and cleared area
    Maintenance --> Homing
    Boot --> Fault
    Homing --> Fault
    Ready --> Fault
    Moving --> Fault
    Settling --> Fault
    Capturing --> Fault
    Returning --> Fault
    Docking --> Fault
    Parked --> Fault
    Fault --> Homing: inspected reset

State invariants

  • Moving: gimbal remains at its safe motion pose; no normal autofocus or capture begins.
  • Settling: Skycam trajectory is stopped; the gimbal reaches its target and waits a measured interval.
  • Capturing: camera autofocus and capture are allowed only after settling.
  • Docking: speed is reduced and mechanical capture is not inferred from coordinates alone.
  • Parked: structural latch engagement and accepted dock confirmation are required.
  • Maintenance: manually initiated only after the area is cleared; automatic logic cannot lower the pod into head space.
  • Fault: no new normal motion is accepted; permitted recovery actions depend on the detected fault and available energy.

Docking baseline

  1. Move to PRE-DOCK approximately 0.3–0.5 m from the nest.
  2. Reduce speed, initially targeting approximately 30–50 mm/s.
  3. Approach while maintaining positive tension.
  4. Let the funnel center the docking stud.
  5. Continue until the passive latch captures it.
  6. Confirm the DOCKED signal using a specified debounce and plausibility rule.
  7. Enter Parked and retain only the tension needed to keep every accessible line above the accepted height.

Departure establishes normal operating tension, releases the latch, verifies release, clears the funnel, and only then resumes normal motion.

Failure and timeout expectations

Every command must have a deadline and defined response to:

  • stale or incompatible configuration;
  • lost edge-to-MCU or edge-to-pod communication;
  • driver alarm or encoder following error;
  • home, limit, or dock sensor disagreement;
  • pod undervoltage or service reset;
  • failed autofocus/capture/upload;
  • motion that exceeds position, time, speed, force, or tension expectations;
  • loss of cloud or Internet access;
  • complete or partial power loss.

The current baseline does not yet define adequate total-power-loss line-clearance behavior. This is a safety gap, not an implementation detail.

Acceptance criteria

  • State and interface schemas are versioned and tested with invalid, delayed, duplicated, and interrupted messages.
  • The motion controller rejects trajectories outside its locally loaded safe envelope.
  • Cloud loss does not prevent local completion, abort, docking, or fault handling.
  • Dock coordinates alone can never assert Parked.
  • Maintenance entry is authenticated or physically controlled and requires an explicitly cleared work area.
  • Hardware and simulation use the same state names, units, configuration schema, and reference scenarios.

Open questions

  • What circuit and restraint sequence implements the cabinet-owned independent inhibition/isolation and Pico/pod local protections assigned in ADR-0006?
  • Is the dock sensor redundant or cross-checked with motor/tension evidence?
  • How is latch release actuated and proven clear?
  • Which alarm and enable signals are carried on the reserved control pairs?
  • What is the safe response to a single-line, driver, encoder, or powered-line failure?