ARBI
Documents / docs/project/glossary.md

Glossary

Term Meaning in ARBI
ARBI Automatic Raised Bed Imaging system.
Anchor Fixed three-dimensional coordinate at a corner positioning-line pulley.
Assembly A physical, replaceable or inspectable unit that owns its component quantities and interfaces.
Build manifest A versioned selection of assembly revisions, quantities, variants, and procurement choices for one build.
Cable spider The central pod structure where the four positioning lines attach.
Corner station Post, foundation/guying, pulley head, mounting interfaces, and local routing at one corner. The winch is a separate mounted assembly.
Dock The high corner-mounted nest, latch, shelter, and sensor used for automatic parking.
Edge service Local service that queues jobs, coordinates motion and pod actions, enforces operating policy, and tolerates Internet outages. Exact hardware is undecided.
Fiducial Permanent visual marker used to estimate image position, rotation, perspective, and scale.
HOME Calibrated location and transition used to reach the dock. HOME is not by itself proof that the mechanical latch engaged.
Hybrid line Dyneema positioning line with mechanically slack electrical conductors helically wrapped around it. Dyneema carries tensile load.
Maintenance mode Manually initiated, access-controlled state that may lower the pod after the area is cleared. It is never an automatic parking state.
Offer Supplier-specific commercial terms for a compatible part, including SKU, pack size, price, currency, MOQ, destination, shipping assumptions, and verification date.
Parked State entered only after the dock mechanically retains the pod and docking confirmation is accepted.
Part A uniquely identified engineering item independent of its supplier offer.
Positioning line One of four motor-controlled lines defining the pod position.
PRE-DOCK Approach position near the dock where speed is reduced before mechanical capture.
Proof load Controlled applied load used to inspect an assembly against defined acceptance limits. It is not a substitute for engineering analysis.
Single-layer drum Winch drum sized to avoid multiple line layers and their changing effective radius.
Skycam motion Coarse three-dimensional pod positioning by coordinated changes to four line lengths.
Starting point Initial commissioning value that must be tuned from measured evidence.
V1 First intended reproducible outdoor release, not merely the first moving prototype.