Local controller recovery source evidence
Work record: #67. Decision: ADR-0028. Implementation: guide.
Host fixtures run the same C input, motion, homing and local recovery sources as the pinned target link-check. Three new groups cover finite commanded completion; old source/target epochs, identities, fences, command IDs and sequences; expired commands and fixed ledger exhaustion; running versus idle edge loss, manual/trajectory expiry and deliberate recovery; partial completion; 100,000 atomic fault signals from a host thread; logical loop stalls, clock reversal, changed configuration, alarm and simulated brownout/reset with diagnostic-only prior-boot history.
Clean revision fded5d108951b9101d6f7355f9e9b08c6168dbd5 (ARBI_BUILD_DIRTY=0) passed all 22 firmware groups normally and under AddressSanitizer/UndefinedBehaviorSanitizer across five host binaries. Both ordinary and isolated-code-check target branches built with pinned Pico SDK 2.2.0 / ARM GCC 12.2.1. The ordinary diagnostic image remains 59,832 text / 57,788 BSS bytes; the denied-permission link-check retains all actual local model functions with 38,860 text / 39,612 BSS bytes. Lint, 25 CI planner/gate checks, documentation links and whitespace passed.
Tests inject local monotonic time and digital/reference fixtures. A loop-stall fixture advances virtual time beyond the owner budget; atomic thread load demonstrates the source latch and fixed storage. Neither establishes an actual interrupt latency, parser-load worst case, hardware watchdog timing or physical stopping response.
| Required evidence | Status |
|---|---|
| Deadline, replay/fencing, reset and recovery source model | Explicit host fixtures; simulation only |
| Actual GPIO/interrupt fault path and reset output circuitry | Unavailable; no real adapter |
| Isolated-board parser/interrupt/main-loop load and watchdog bounds | Unavailable; no attached board or instrument traces |
| Secured loaded response, independent isolation and hard limits | Unavailable; no selected or measured physical stop response |
| Power-loss four-line clearance and qualified installed recovery | Unavailable; LS-18 gate remains unresolved |
#67 remains open. No physical stop/hold/disable result, real reset-cause measurement, reviewer sign-off, retained power-loss diagnostics or actuation authority is claimed.