ARBI
Documents / docs/assemblies/camera-pod/booklet/README.md

Current assembly guides

cad-v0.1.41 · current PDFs and STL/source packs The publication notes below explain the artifact and evidence status.

Camera pod assembly booklets

Current compact retention: assembly r0.5.0 has zero ties; its removable retainers, liners and hardware are in the current print/assembly list. The archived PDFs below retain their original configurations. Physical grip, fatigue, fit and complete mass remain unverified.

The checked-in publications below are the earlier enclosure r0.1.0 and unchanged dry bench snapshots. The tie-free camera-pod-assembly r0.5.0 uses enclosure booklet revision 11. Rebuild it locally from CAD with the build command, or use CI artifacts or releases matching the selected commit when available. It uses integrated deck/carrier r0.3.0, head/cradle/support r0.2.0 and rain hood r0.3.0, with optical hood r0.2.0 and tray r0.2.3. The fastener design and inventory replace M2.5/M4 and 35 mm screws with M3 × 12/25 and M2 × 8. The four loose spacers are integrated into the deck. Use its own print list and hardware; the dry bench kit and dated snapshots retain their original hardware.

Reproduce the current enclosure build from the repository root:

python3 scripts/camera-pod-booklet/build.py --enclosure --output hardware/generated/camera-pod-compact-gimbal

The preferred integrated appearance follows the industrial design conventions. Choose one configuration and use its own print list and hardware stacks.

Configuration Assembly guide Source / mesh pack
Integrated rain/splash enclosure Revision 2, 16 A4 pages 48-STL pack
Dry bench alternative Revision 4, 14 A4 pages 41-STL pack

Both historical 7 October 2026 publications use the r0.1.1 dry deck/yoke, the CAD and nominal hardware meshes of their own revisions, source hashes, assembly transforms, geometry/service reports and an assembled GLB. They replace the earlier published dry bench revision 2; that r0.1.0 snapshot remains in Git history. The dry cover is white, and is omitted from the rain kit.

The current enclosure configuration owns its 16 fabrication models, 18 installed prints, replacement list, hood/head/camera hardware and supported harness/service steps. The dry mount document owns the alternative quantities. The current pack inventory is generated from its 16 fabrication models and selected hardware references. The test coupon is optional; do not print every STL as an installed part.

The current enclosure record, historical enclosure evidence and dry bench evidence distinguish sampled rigid CAD checks from physical validation. Received-part fit, flexible cable behaviour, electrical function, strength, rain, heat and flying mass remain unverified. The earlier compact-gimbal build passed its stated sampled nominal checks and totalled 253.622 g for 16 installed prints as a solid-volume PETG estimate at 1.27 g/cm³. This excludes electronics and hardware, is not sliced or measured mass, and does not demonstrate the 170 g complete-pod ceiling.

The owner requested the updated publications on 7 October 2026. PDFs and ZIPs are reviewable snapshots; canonical geometry remains hardware/**/*.scad, and loose meshes/bulk renders remain untracked. Follow the rebuild instructions and regenerate each PDF and pack together with --publish after changes.

Enclosure revision 2 and bench revision 4 refresh every illustration as white-face line art with dark silhouettes and visible feature edges, so black brackets and hardware remain readable. Configuration headers and page totals are specific to each variant. The GLB and assembly manifests retain the product palette.

Booklet CI builds affected booklets on relevant PRs and all five on release runs or manual dispatches. On main, CAD release CI adds their PDFs and STL/source packs to the same commit's geometry release. Checked-in files remain dated snapshots; tagged releases contain current commit-matched builds.

Received-converter update, 12 October 2026

The received-unit and CAD record supersedes the converter envelope and retention in the archived snapshots above. At the converter-only revision, generator outputs were enclosure revision 6 (16 pages, deck r0.1.1) and bench revision 5 (14 pages, deck r0.1.2). Both use four M2.5 × 10 converter screw stacks and the measured 50 × 30 × 17 mm envelope with Ø3 mm holes at 45 × 24 mm pitch. The compact centre moves to [35,0] and the dry centre to [46,0] to clear existing frame nuts. Tagged CAD releases publish the regenerated PDFs/ZIPs; committed earlier PDFs retain their original revisions.

Camera hood assembly correction — 14 October 2026

Reprint only white P09 r0.1.3 for the repeat insertion failure. Its lower flared walls, open CSI edge and larger optical opening are illustrated in enclosure booklet revision 9. Prepare the camera in the loose hood on the bench before clamping it to the cradle; inspect all four PCB seats and connect the ribbon while accessible. Existing four M2 ×12 bolts, four nuts and eight washers remain. The new fit record records nominal mesh/path checks and the required physical reprint inspection. Committed historical PDF/ZIP snapshots retain their stated revisions; use the current source build or matching CI/release artifacts for this update.